Thursday, November 26, 2009

major reduction of transportation cost to orbit

Dietrich E Koelle
ABSTRACT:

It is generally assumed that substantial improvements of technology are required for the next generation of (reusable) launch vehicles. However, this is not necessarily true, even though technology development programs have been performed or started in Europe ( S�nger, FESTIP, FLTP, Astra), the USA (NASP-, X-33-, X-34-, SLI-Programs) and Japan. The new technologies required depend very much on the launch VEHICLE CONCEPT envisioned. Therefore, an early assessment and selection of an RLV System is required. There are simple and cost-effective reusable launch systems which can be built with presently existing technology (such as the Kistler K-1 which is under development); and there are highly complex winged RLV concepts with combined propulsion requiring a host of new technologies. In this case it is even questionable whether such systems will be cost-efficient at all. The tremendous difference of potential launch vehicle system concepts and the required new technologies do not only have a dramatic effect on development cost and time schedule but also on the later operability (risk and reliability) as well as on the finally achievable reduction of transportation cost into space.

1. Principles and Trends

The majority of present launch vehicles have been derived from military missile projects where costs and economics have not been an important criteria. Launch capability and national prestige were the main drivers.

However, things have changed: Launch services have become a commercial business where cost and economics are the major factors, amplified by international competition. This requires an open information policy and customer service which apparently represents a difficulty for developing countries which - on the other hand - do have a cost/price advantage.

However, the cost advantage of those traditional expendable launch vehicles will disappear as soon as reusable launch systems become operational. Reusable launch systems are expensive to development, however, they provide a number of advantages in comparison to expendable launchers:

  1. a major reduction of transportation cost to orbit,
  2. potential payload (and/or junk) return capability from orbit,
  3. inherently higher flight reliability (by higher reduncdancy and automatic health control systems),

and

  1. less environmental pollution, no danger of impacting stages.

From the very principle it also seems economically unacceptable (a waste of resouces) to use a vehicle of 50 to 100 Mio.$ value for one single flight of only 10 to 15 minutes duration. Alone the idea of using, by example, a B.747 aircraft for one single flight only shows how absurd the present situation in the space launch business is.

The development of a new reusable launch vehicle is a major effort and requires a high-level decision and appropriate funding. Since there are many vehicle concept options (which all have already been studied repeatedly) a decision in favour of one preferred RLV Concept apparently is difficult to make. It is far easier to resort to another "Technology Program" as demonstrated in the USA and Europe. Such technology programs can be very useful, however, they can also be a waste of money and time. In Japan the situation is somewhat different: an RLV concept selection has been made by a National Commisssion before the reorientation of the technology development activities was initiated in the year 2000.

2. Vehicle Concepts and Technology Requirements

It is recognized generally that the related technology must be available at the start of a dedicated vehicle development programme in order to reduce the technical and financial risk. However, a dedicated, effective technology development is only feasible after a decision on the vehicle configuration has been made. Otherweise the risk is large that a good share of the funding is waisted in unnessary activities. The development of Carbon-Composite hydrogen tanks for the X-33 vehicle, by example, has been proven as an unnecessary risk and cost item. Conventional aluminum tanks are doing the purpose at the same weight in this case.

The range of technologies for potential future RLVs represents a very large spectrum, defined by the variety of potential vehicle systems. These are listed here in sequence of increasing technological complexity (FIGs.1 to 4).

FIG.1: Ballistic VTOL Launch Vehicle Concepts ( Kankoh Maru, BETA, K-1)
  1. Ballistic SSTO Vehicles ( VTOL), such as the MDA "Delta Clipper",the Beta-Family and " Kankoh Maru"
  2. Ballistic TSTO Vehicles (VTO), such as the Kistler K-1 Vehicle or the "Neptune"-Concept
  3. Winged SSTO Vehicles with Rocket Propulsion (VTO), such as FSSC-1 and the LMC "Venture Star" as Lifting Body-
  4. Winged TSTO Vehicles with Rocket Propulsion (VTO) with parallel or tandem staging;
  5. Winged TSTO Vehicles with Airbreathing Propulsion in the First Stage and Rocket-propelled Second Stage (HTO) such as the German SAENGER Concept and the Boeing " Beta"
  6. Aerospace Plane ( SSTO) with Scramjet-Rocket Propulsion
FIG.2 : Winged VTO/HL-Launch Vehicle Concepts (Rocket Propulsion)

In addition to the basic vehicle concept options there is the controversial case of Single-Stage-to-Orbit ( SSTO) vs. Two-Stage-to-Orbit ( TSTO) vehicles to Low Earth orbit ( LEO). It has been stated repeatedly that two-stage vehicles are less demanding with respect to technology than SSTOs. This is not correct: any second stage with orbital capability and re-entry/landing requirement needs exactly the same technology as a single-stage vehicle of the same configuration. True is that a TSTO vehicle normally has a lower launch mass (and size) than a single-stage RLV with the same LEO payload. Size, however, is NOT a major cost driver, but two stages plus pre-flight integration and in-flight stage separation, plus fly-back of the first stage are a great incease of complexity and cost.

FIG.3 : Two-Stage Launch Vehicles with Airbreathing First Stage (S�NGER with Mach 6.7 First Stage and AN 225 + HOTOL)

The discussion of SSTO vs. TSTO, however, is more or less obsolete since most missions go beyond LEO and equire an additional stage anyhow. Therefore, the technical vehicle design options in reality are:

  1. FIRST STAGE as low-speed booster
    -- with fly-back or glide-back capability to the launch site
    (range <>
  2. FIRST STAGE with high-speed capability (i.e. Mach 7)
    -- with turbojet engines for cruise flight back to the launch site
    (range > 1000 km)
  3. FIRST STAGE with orbital speed capability (Mach 25) and with return to the launch site after re-entry
FIG.4 : Aerospace Plane Concepts with Scramjet/Rocket Propulsion

The SECOND STAGE required for options (1) and (2) can be either

  1. an expendable stage or propulsion module,
  2. a reusable Ballistic Stage Vehicle with vertical landing,
  3. a winged vehicle (similar externally to the Shuttle Orbiter) with horizontal landing.

Size and technology demands are very high - almost the same as SSTO vehicles - for First Stage Concept (1), and less for Concept (2).

SEMI-REUSABLE vehicle concepts, such as one or two Flyback-Vehicles attached to an expendable core vehice, have not yet been able to prove their economic viability. The development cost of the reusable vehicle are high, while the expendable stage does not allow to achieve the desired essential Cost-per-Flight reduction.

Avoiding the complexity and different design requirements of a SUBORBITAL STAGE (i.e. flyback aircraft cruising ) is both a cost advantage as well as an operational simplification. Therefore, the ORBITAL capability first stage is preferable -- even though this does lead to a larger-size vehicle - as long as the dimensions are acceptable from a practical standpoint. Advanced structure materials can reduce the vehicle size, but this does normally NOT result in lower costs.

The famous "Aerospace Plane"- SSTO with combined rocket-scramjet-rocket propulsion and a record number of technologies to be developed, has even questionable economics: the large vehivle dry mass to be placed into orbit is a major cost driver.

It is an often-found misunderstanding and anachronism to seek a vehicle with minimum size/maximum performance. This is the old performance-based paradigm which is no longer applicable for a commercial space transportation business. It simply is too expensive.

The basic ground rule for a future RLV must be to conceive the most simple system for reasons of minimum development cost and operational simplicity/reliability.

Any new technology means additional cost and higher risk. This is valid especially if new technology means higher complexity:a negative example in this sense is, by example, the suggestions for tri-propellant rocket engines where a 3 % performance gain is payed for by a 50% increase in the propellant system components and complexity. The much better solution is to increase the size of the bipropellant system by 3 % at almost no cost.

Another example is air collection and liquifaction for oxygen production during cruise flight of the first stage. In this case the simple and cheap oxygen is replaced by a complex machinery.

In TABLE I all dedicated critical technologies techniques and problems are listed which are associated with the various RLV Concepts on page 2 . It becomes clear that a great difference exists between the vehicle concepts - with resulting differences in development costs. Two-stage to LEO-Vehicles imply not only the development of two different systems, but in addition the problems of control dynamics and aerodynamics of the combined system in the initial ascent phase - with subsequent stage separation. It is repeated here that the second stage of TSTO systems require exactly the same technologies as a single-stage vehicle.

According to TABLE I there is a factor 7 difference between a ballistic SSTO rocket vehicle and a HTOL airbreathing scramjet SSTO. About the same difference applies to the development costs.

TABLE I : Technologies, Techniques and Problems of the Different RLV Concepts

TECHNOLOGY1 and 23 and 456
BALLISTICWINGEDAB-- TSTOAB-- SSTO

CFK CRYO TANK @@@@@@
TPS MET.MULTIWALL @@@@@@
HOT WING STRUCTURE ..@@@@
CFC CONTROL PANELS ..@@@@
SiC-PANELS .....@
Ti/CC-MATRIX STRUCTURE .....@@
FUEL CELL POWER SYSTEM ..@@@@
HOT ACTUATORS .....@
AIR DATA SYSTEM ..@@@@
LH2-COOLED STRUCTURE .....@@
SLUSH HYDROGEN TECHNOLOGY .....@
CFD TECHNIQUES ..@@@@
STAGE SEPARATION .@.@@.
COMB. CONTROL & AERODYNAMICS.@.@@.
ADVANCED AVIONICS .....@
FLYBACK-(CRUISE) PROV. .@.@@.
VERTICAL LANDING PROV. @@....
HIGH-PRESS.ROCKET ENGINES ..@@@@
VARIABLE AIR INTAKE/NOZZLES....@@@
SCRAMJET PROPULSION .....@@
TURBO/RAMJET PROPULSION ....@.
AIR-EJECTOR ROCKET ENGINES .....@

TOTAL No. 368111321

3. Conclusions

The development effort required for a Reusable Launch Vehicle System ( RLV) is very much dependent on the vehicle concept selected. The development cost can range from 2 Billion USD as a commercial venture to some 20 Billion USD or more as a "Business-as-Usual" (BaU) governmental program.

Therefore, a major decision is required at the beginning about the purpose of the RLV-Program:

  • to support technology development and demonstrate "technological leadership" (national prestige) or
  • to create a low-cost space transportation system.

Here the interests of industry and Government are not necessarily the same which causes conflicts and delays decisions.

The compromise of a "multi-purpose vehicle" (such as the Space Shuttle) needs high development cost and is expensive to operate. Therefore, the initial vehicle concept decision decides already about the development cost bracket and the operational economics.

REFERENCES:
  1. D E Koelle, 2000, " Handbook of Cost Engineering for Space Transportation Systems", with TRANSCOST-Model 7.0, 224 pages, Report TCS-TR-168(2000), TCS-TransCostSystems
  2. I Bekey, January 1994, " Why SSTO Rocket Launch Vehicles are now Feasible and Practical - A White Paper", NASA Hq.
  3. D E Koelle, 1997, " Cost Engineering - The New Paradigm for Launch Vehicle Design", Paper IAF-97-IAA.1.1.04, IAF-Congress Torino 1997

GCE (A/L) 2009

GCE (A/L) 2009: Success rate 63 per cent
http://www.simplechemconcepts.com/wp-content/uploads/2009/01/2008-gce-o-levels-results.jpg

Examinations Chief Anura Edirisinghe yesterday said that of 199,000 GCE (Advanced Level) candidates, 126,000 had passed the examination. He said the success rate was 63 per cent.

The Examination Department yesterday released the results of the A/L examination held in August 2009.

M. Sivapathasundaram (Saiva Mangaiyar College, Colombo 6) with an average Z Score of 2.9388) came first in Bio science stream and Nipuna Randunu Samarasekara (Ananda College, Colombo with an average Z-Score of 3.3439) topped the list in the Maths stream.

Y. Pasindu Namal Jayawardane (Rahula College) ranked first in the Arts stream with an average Z-Score of 2.5705), while Pasan Malinda Katipearachchi (Mahinda College) with an average Z-Score of 2.8354) secured the topmost position in Commerce stream.

Students who are among top three in each stream are as follows.

Arts stream: S. Mihiri Hirudini, CS/Sirimavo Bandaranaike College, Colombo (2.5507). Chamila Sampathmali Karunaratne K/ Pushpadana Balika Maha Vidyalaya Kandy (2.5198).

Science stream: Madushi Maheshika Ranatunga CS/ Visaka Balika Maha Vidyalaya, Colombo (2.9109). K.P. Madusanka Perera, CS/ Nalanda College, Colombo (2.8496).

Commerce stream: M.M. Lanka Hansanie, G/Sangamitta Balika Maha Vidyalaya, Galle (2.7402). G.K.U. Malsha Madhusghanika, KG/Nagagiri Maha Vidyalaya, Hemmathagama (2.6967).

Mathematics stream: A.C. Johnnirajh, J/Hartlly College, Point Pedro (3.3439). M.G. Binu Amarathunga, CS/ Nalanda College, Colombo (3.2027). (SI)

Taliban leader rules out talks with Karzai

Taliban leader rules out talks with Karzai
http://easterncampaign.files.wordpress.com/2008/03/hamid_karzai_2006-09-26.jpg

KABUL (AP) - The Taliban’s reclusive leader has ruled out talks with President Hamid Karzai and called on Afghans to break off relations with his "stooge" administration.

In a statement, Mullah Omar also insisted foreign troops were losing the war in Afghanistan.

His message, issued Wednesday ahead of the Muslim Eid holiday, came a week after Karzai reached out to the Taliban during his inauguration speech, saying it was important to include in the government former Taliban who were ready to renounce terrorism. The hardline militia has long refused to negotiate with the Karzai government or join what it considers a puppet administration.

"Ground realities in our beloved country indicate that the invaders are about to escape," Omar said in the message posted on a Web site used by the Taliban and e-mailed to journalists from an address often used to send out his statements.

Omar led the Taliban regime that was toppled by the U.S.-led invasion of Afghanistan in 2001, and has not been seen since. Afghan officials claim he is in hiding in Pakistan.

As the Taliban insurgency gathers strength, President Barack Obama has been considering plans to send tens of thousands more U.S. troops to Afghanistan. U.S. military officials expect an infusion of approximately 32,000 to 35,000 troops to begin in February or March. It would be the largest expansion since the beginning of the war eight years ago.

NATO countries are also preparing to send more soldiers, with British Prime Minister Gordon Brown saying 10 NATO nations are ready to offer about 5,000 more troops. Britain, which has 9,000 troops in Afghanistan, the second-largest contingent after the United States, has not named the countries it claims will provide the extra troops.

As part of efforts to bolster Afghanistan’s own security forces, the Interior Ministry announced Wednesday a salary hike for police to help boost recruitment and retention and curb rampant corruption in the force that suffers a higher death rate than the nation’s army.

Bolstering Afghanistan’s police force, which is underpaid and under-equipped, is seen as crucial to improving security and eventually allowing foreign troops to go home.

Interior Minister Mohammad Hanif Atmar said monthly salaries for police working in high-risk areas will increase from $180 to $240, while those of police in lower risk areas will increase from $120 to $210.

Chief spokesman for the NATO-led force in Afghanistan acknowledged the Taliban had gained momentum in their insurgency. "We need to neutralize locally some of those initiatives to slow them down," Canadian Brig. Gen. Eric Tremblay said.

But he also said the militants were aware of progress made in the country with international support, so were trying to undermine the government.

"At the end, President Karzai has been quite clear that reconciliation and reintegration is on the table," Tremblay said.

In his message, the Taliban leader urged Afghans to eschew the Karzai government.

"I hope you will continue your legitimate jihad (holy war) and struggle in the way of realizing your Islamic aspirations ... and break off all relations with the stooge Kabul administration," Omar said.

Omar said there would be no negotiations that would prolong or legitimize the presence of foreign forces in the country.

Wednesday, November 18, 2009

Sri Lanka has potential as manufacturing base in SA

Advantages of low cost production, literate workforce:

Sri Lanka has potential as manufacturing base in SA

Japan-Sri Lanka Business Co-operation Community Chairman, Sumitaka Fujitha, Public Administration and Home Affairs Minister and Deputy Finance Minister, Dr. Sarath Amunugama and Sri Lanka - Japan Business Co-operation Committee President, Daya Weththasinghe at the 15th joint meeting of the Sri Lanka - Japan and Japan-Sri Lanka Business Co-operation Committee. Picture by Sumanachandra Ariyawansa

Japan-Sri Lanka Business Co-operation Community Chairman, Sumitaka Fujitha said Sri Lanka has the potential to be the manufacturing base in the South Asian region as it has the advantages of low cost production, highly competitive and a literate workforce compared to other countries in the region.

He was addressing the 15th joint meeting of the Sri Lanka-Japan and Japan-Sri Lanka Business Co-operation Committee at the Galadari Hotel yesterday. The meeting was organized by the Sri Lanka - Japan Business Co-Operation Committee of the Ceylon Chamber of Commerce and the Japan-Sri Lanka Business Co-operation Committee of the Japan Chamber of Commerce and Industry. The meeting will conclude on Friday.

Japan-Sri Lanka ties

* Japan to help Sri Lanka further in reconstruction and rehabilitation

* Many attractions for investors to select Sri Lanka for FDIs

* Sri Lanka poised for economic expansion and growth

Sri Lanka also has a vast market in South Asia through the South Asian Association for Regional Co-operation (SAARC) and it has provided much economic potential. As peace has been established the country could look forward to rapid economic growth, he said.

Fujitha said that one of the reasons for the reduction of investments by Japanese entrepreneurs in Sri Lanka was due to the threat posed by the LTTE in the past. When Japanese investors select a country they look for human resource security as their first priority and with the dawn of peace more Foreign Direct Investments (FDIs) will flow into the country.

He said Japan hopes to help Sri Lanka further in post conflict reconstruction and rehabilitation. This meeting will help the two countries to further strengthen economic trade ties.

Public Administration and Home Affairs Minister and Deputy Finance Minister, Dr. Sarath Amunugama said Sri Lanka’s relations with Japan extend over half a century and our diplomatic relationship with the country is strong and cordial.

Japan has assisted Sri Lanka in several sectors and has always helped the country in times of need.

He said there were many attractions for investors to select Sri Lanka for FDIs including the availability of the largest market in South Asia. Sri Lanka is not too far to become the second largest consumer market.

We have been able to sustain an economic growth rate of five percent over the past four years even during the global economic meltdown and hope to achieve an economic growth of six - seven percent this year. With the developing activities we hope to accelerate the whole economic process.

Ambassador of Japan in Sri Lanka, Kunio Takahashi said Sri Lanka is poised for economic expansion and growth has a good potential for foreign investment. The Government of Japan has encouraged entrepreneurs to invest in Sri Lanka, especially in the Eastern province and in some parts of the Northern province. The Government of Japan also encourages Japanese tourists to visit Sri Lanka.

He said Sri Lanka has a stable macro economic state and hope that Sri Lanka would seize this opportunity to grow as an emerging economic power in the South Asian region. Though all these development activities would take some time, it will have a rapid take off and this relationship would benefit Japan and Sri Lanka.

The Ceylon Chamber of Commerce Chairman, Anura Ekanayake said as we celebrate 30 years of business relations, Sri Lanka could emerge as the next economic giant of South Asia. Japan also became an economic superpower having experienced the Hiroshima disaster and worked very hard thereafter to re-build gradually. We in Sri Lanka could learn many lessons from Japan as we too also experienced a similar situation. The future of the economy shows many potential areas and we hope that the business community would take advantage of it.

Meeting world leaders


Home

Meeting world leaders





Obama meets with half brother in China

Obama meets with half brother in China
http://theonesilove.files.wordpress.com/2008/10/obama-girl.jpg

BEIJING (AP) - When President Barack Obama landed in Beijing on Monday on his first state visit to China, his first order of business was family business.

Before he headed to a formal dinner with China’s President Hu Jintao, he set aside time to see his half brother, Mark Ndesandjo, and Ndesandjo’s wife, who had flown up from the southern boomtown of Shenzhen where they live.

Describing the meeting Monday as "overwhelming" and "intense," Ndesandjo told The Associated Press in an interview Wednesday that he had long anticipated the chance to welcome his famous brother to China.

"My big brother, you know I think he was on his way to see the president of China. ... He came directly off the plane, changed some clothes and then came down and saw us. And he just gave me a big hug. And it was so intense. I’m still over the moon on it. I am over the moon. And my wife. She is his biggest fan, and I think she is still recovering," he said with a laugh.

Ndesandjo said he bought tickets to fly to Beijing months ago, hoping to reconnect with his brother. The two last met in January when Ndesandjo attended Obama’s inauguration in Washington, D.C., as a family guest.

The three had a long chat, with Obama being introduced to Ndesandjo’s wife, a native of Henan, China, whom he married a year ago, he said. He gave few specifics about what they discussed.

"All I can say is, we talked about family, and it was very powerful because when he came in through that door, and I saw him and I hugged him, and he hugged me and hugged my wife. It was like we were continuing a conversation that had started many years ago," he said.

Ndesandjo is tall and slim, with close-cropped hair that gives him a strong resemblance to his brother.

The two men did not grow up together. Ndesandjo’s mother, Ruth Nidesand, was Barack Obama Sr.’s third wife. Just before he arrived in Beijing on Monday, Obama had been in a townhall-style meeting with students in Shanghai, where he joked with the audience that a family gathering in his home "looks like the United Nations."

President Obama’s father had been a Kenyan exchange student who met his mother, Stanley Ann Dunham, a Kansas native, when they were in school in Hawaii. The two separated two years after he was born.

The senior Obama later met Ndesandjo’s mother as a graduate student at Harvard University, and the two returned to live in Kenya, where Mark and his brother, David, were born and grew up. David later died in a motorcycle accident.

Obama’s mother went on to marry an Indonesian man and he spent part of his young life in Jakarta. His sister, Maya Soetoro-Ng, is half-Indonesian and her husband is Chinese-Canadian.

Since 2001, Ndesandjo has been living in the booming southern Chinese city of Shenzhen near Hong Kong and earns a living as a marketing consultant. For most of that time, he has maintained a low profile, with few people knowing his connection to the U.S. president.

But two weeks ago, he went public to launch a new novel, a semi-autobiographical book called "Nairobi to Shenzhen" that features a protagonist who is the son of a Jewish mother and an abusive father from Kenya.

The book, available over the Internet by the self-publishing company Aventine Press, was partly meant to raise awareness about domestic violence, he said. His father beat him and his mother when they were living in Kenya, Ndesandjo said.

"For a long time, I had serious, serious reservations about using that name (Obama) because of the hurt I experienced," he said. Though he wanted to maintain his privacy, he decided to write the novel because "there are certain things you can do and you really should do because you know it will help people."

Triumph over terrorism

Triumph over terrorism



The Army was a major stakeholder in the operations against LTTE.

Our valiant soldiers made their tremendous contribution to wipe out the ruthless terrorism from the country after decades. The war against terrorism in terrain jungle of the North and the East had come to an end without leaving a trace of the LTTE. Thousands of soldiers laid down their lives and lost their limbs to save the mother Lanka. Triumph of the war was achieved by the gallant soldiers marching towards the LTTE forward lines and smashing their targets. The Army soldiers paved away to the victory in its world biggest humanitarian operation with less casualties.

Army's diverse roles after Vanni humanitarian operations

The final culmination of the Wanni and Eastern humanitarian operations with the death of the terrorist supremo in Nanthikadal lagoon, meant that the entire Northern and Eastern regions as well as the country at large became completely freed from the brutal grips of LTTE. In the immediate aftermath of final battles, Army troops while attending to urgent basic requirements of those internally displaced people (IDPs) as the first leg were entrusted with the arduous task of clearing debris and remnants of destroyed infrastructure. Untiring soldiers completed their assignment within the shortest possible time as the State machinery was creeping in for post-war restoration and re-development in those ravaged areas. Taking immediate security concerns into consideration, Army troops were subsequently deployed and scattered in all sensitive areas in order to strengthen security concerns and stall any attempts of infiltrations as normalcy was fast taking root in liberated areas.

In fact, the Army as the major stakeholder in the operations against terrorists found not even a glimpse of space for rest or recreation and relaxation, instead extensive follow-up work, reconnaissance, maintenance of strict 24-hour surveillance and vigilance, and subsequent security measures inevitably warranted deployment of more and more troops in newly cleared areas. More significantly, troops were compelled to have more sentry/checkpoints manned, roadblocks maintained, search and clear operations conducted, new security detachments established and basically all other respective requirements streamlined. New reinforcements, despite dangers of being exposed to LTTE's abandoned booby traps, UXOs and mines, had to serve above urgent and vital commitments. In reality, the extent of the region and its return to normalcy demanded deployment of more troops than those had been deployed for operations against terrorists.

In short, the Army's role turned more demanding and complex in peacetime, as more and more responsibilities in the civil sector were finding their way into those areas. More secured patches of land mass meant more expanded service commitments, hence the need to multiply the numbers became increasingly necessary. The scenario was identical to that of Jaffna after the troops cleared the entire peninsula of terrorists many years ago.

Training

The shift of focus gradually began giving priority now to stalled Army training and skill development programs among Army personnel who had to forego their career development training for well over 3 - 4 years for the sake of the country, as the offensives against the foe were reaching their apogee, day by day. Multifaceted service commitments and ground realities on the other hand continued to deprive hundreds of troops of their prospective routine training opportunities and prospective promotions.

All training establishments, regiments and different units meanwhile on the instructions of the Army Headquarters put their training schemes back on track. Opportunities for UN peace keeping training assignments were also equally expanded immediately as more troops were inducted for the purpose. Recruitment of new youth to the Army received a tremendous response following war victories. Meanwhile, steps were taken to introduce a new Diploma for short-term officer-cadet training course at the Diyathalawa Military Academy enabling officers to collect new qualifications to budding officers.

The wide training scheme, the Army usually follows, is to see the light of day soon as new Headquarters in Mullaitivu and Kilinochchi formations elsewhere identify their ground requirements.

Humanitarian Role

Army's diversified roles and tasks cover many areas of human development and eventual emergencies. Minefields planted haphazardly and left unmarked by terrorists have posed a greater threat than ever before, since records to that effect were not available, the challenge, despite the gravity of the task was adroitly accepted by Army Engineers, who have already received training in that field.

De-mining in war-torn northern area accordingly set in with the assistance of government and Non Governmental Organizations. To-date Army Engineer troops in this sphere have taken the lead and are in the process of receiving more and more teeth by way of receipt of new equipment being imported.

The government's initiatives have already brought down Indian de-miners also for the same purpose who would work in coordination with Army de-miners.

Contribution to Constructions

Simultaneous construction work, launched in the north and east by the government continues to receive the full backing of the Army, as troops have time and again proved that they are exceptionally adept in meeting with any challenges, either in re-construction work or anything else. In the most recent past, troops to their credit brought back the pristine glory of the most venerated Madu Shrine after completion of the entire renovation work at Army cost.

At the moment, soldiers in their thousands are busy re-constructing, restoring and renovating war damaged infrastructure in the Wanni region while erecting many new public buildings, schools, administrative structures, sacred places, etc.

Outstanding among some of those development projects include construction of bridges and major road building work, in which Army troops have been playing a leading role.

Both Kilinochchi and Mullaittivu districts, whose infrastructure remained wantonly damaged due to LTTE terrorism are fast receiving a speedy facelift as hundreds of troops are engaged in re-building work under 'Uthuru Wasanthaya' (Northern Spring) program with the supply of new machinery, caterpillars, bulldozers, cranes, etc imported particularly for this express purpose.

Army troops play a prominent role as far as disaster management measures are concerned.

Their all-time preparedness came to the fore when the influx of civilians in Puthukudiyiruppu-Nanthikandal areas occurred during final phases of the war.

They were rescued, accompanied in knee-deep waters, provided transport and even ambulances in some cases to take the sick to the nearest hospital and finally re-located elsewhere amidst hails of gunfire and commotion.

To this date, Army troops, hand in hand with local law-enforcing authorities are providing round the clock services with the coordination of civil authorities. In the meanwhile, rehabilitation scheme of LTTE young men and women is also ably supported by the Army.

It is also pertinent to mention here that Army troops still continuing their search and clear operations and de-mining in the Wanni have been playing a commendable role assisting the re-establishment of Police stations.

The Army's post-war engagement with numerous development schemes, now in full swing, giving priority to resettlement, restoration and rehabilitation will continue to be further strengthened as time goes on.